Emergency Info
Share on: 
Stormwater Monitoring Results
1-01-13
CDM has prepared a summary of the results from the 2011 stormwater sampling required under the Town's Stormwater Management Plan for the Municipal Separate Storm Sewer System Permit.  This letter presents the results from the two sampling events in 2011, identifies those parameters that consistently exceed acceptable ranges (over the four year sampling period, 2008-2011) and provides recommendations for further studies to determine the source of contamination at those locations.
  Storm Water Monitoring Results (1).    Storm Wataer Monitoring Results (2)